905 N Hickory

905 N Hickory - Exterior

We are finishing up the exterior and grading while we wait for cabinets. We have finally got the garage door installed.

905 Hickory - Siding

I should probably post an update for this project. Siding is mostly completed with just a few details needed to be finished on a return trip. One of those details is to paint that white louver the same color as the trim. The interior is just about ready for rough inspections.

Foundation

The foundation was pored and set. The site was back-filled. Sewer and water have been hooked up to the mains. The excavator will come back to smooth out the site a bit. And next we'll be starting the carpenter on the 1st floor deck.

Here’s a few different angles of the site. By the way, those 2x12’s sticking up out of the foundation are there to support the walls during the back fill.

905 N Hickory - Digging

Excavation is complete. This is going to be a great home.

It’s nice that we are starting this one in Summer so we can get it closed up and heated before it gets cold out.