The foundation was pored and set. The site was back-filled. Sewer and water have been hooked up to the mains. The excavator will come back to smooth out the site a bit. And next we'll be starting the carpenter on the 1st floor deck.
Here’s a few different angles of the site. By the way, those 2x12’s sticking up out of the foundation are there to support the walls during the back fill.