353 N Emroy

353 N Emroy - Final Interior Photos

Here is the finished home.

353 N Emroy - Flooring & Stairs

Both the oak flooring & oak stairs are installed. Next up is interior trim & millwork. Cabinets have been delayed so we’ll do everything we can until those come in.

353 N Emroy - Exterior Siding

The exterior siding is almost complete. We just need to add the post column wrap on the front stoop. The interior is dry walled, but not much to look at yet. We are starting tile this week.

353 N Emroy - Demolition

Architecture & engineering are approved with the City so we can move forward with the demolition. We should be able to move right into construction.

353 N Emroy

We are preparing for another demolition & build. Here we are finishing the sewer & water disconnect.