Figured it was about time for some updated photos of Bothwell. The weather has been brutal this year; really slowing us up. The masons were able to start last week, but then temperatures dropped again so we have to wait. The new pictures show the stairs by Designed Stairs, and the freshly primed walls.
Home Progress
Bothwell - After Drywall
Bothwell is moving along. Though due the the extreme temperatures we have been having it has been moving slowly. The house is ready for priming, but the garage is still too cold to hang drywall.
Bothwell - Rough
Rough Plumbing, Mechanicals, Electric, and Framing completed. After we pass inspections insulation begins. Then we can finally heat the place up.
111 S Bothwell - Framing
Bothwell is moving along. Roofers start this week.
111 S Bothwell - Trusses
Here's a quick drive by photo of Bothwell with the trusses up.
248 S Hale - Finished
This home is just about finished. Only a few quick miscellaneous items remain. Here's a look at the finished product.
248 S Hale - Painting
Here are a few rooms of Hale freshly painted. The windows have also been cleaned.
111 S Bothwell - Raising Walls
The first floor deck is on. We helped raise the back wall today. Hopefully Com Ed will hook up the electric soon so we can get off the generators.
111 S Bothwell - Foundation
The foundation is up.
Once the small strips of Styrofoam are removed you'll see a small brick ledge that allows us to go lower with the bricks. This is a nice detail as is hides much of the concrete foundation on the finished home.
248 S Hale - Cabinet Installation
I almost forgot I took these. Here are a few pictures of when George was installing the kitchen cabinets a few weeks ago.