Home Progress

111 S Bothwell - Sewer & Water Hook up

At least the water got hooked up.  The sewer was an old clay pipe that will need to be replaced.  We will do that just before backfilling the foundation.

248 S Hale - Painting

Wood floors have been completed and stained.  They have been covered for protection. We have the painters in there for the next few weeks.

248 S Hale - Exterior, Garage, & Base

248 S Hale - Oak Floors Installed

The floors & stairs are in.  Sidewalk, front, & rear stoop are poured. Interior doors, trim, and base are being installed. 

111 S Bothwell

Here is a rough front elevation for the spec house on Bothwell.   Construction begins soon. 

248 S Hale - After Insulation

We just passed the insulation inspection.  The Brick & Siding Are just about done.  Getting ready for drywall.