At least the water got hooked up. The sewer was an old clay pipe that will need to be replaced. We will do that just before backfilling the foundation.
Home Progress
248 S Hale - Painting
Wood floors have been completed and stained. They have been covered for protection. We have the painters in there for the next few weeks.
248 S Hale - Grading
Fuzzy just finished grading the lot.
248 S Hale - Exterior, Garage, & Base
248 S Hale - Oak Floors Installed
The floors & stairs are in. Sidewalk, front, & rear stoop are poured. Interior doors, trim, and base are being installed.
111 S Bothwell
Here is a rough front elevation for the spec house on Bothwell. Construction begins soon.
248 S Hale - After Drywall
Here are a few rooms of Hale just after the drywall was put up before taping.
901 N Hickory - Sketches
Thinking about something like this for Hickory.
248 S Hale - After Insulation
We just passed the insulation inspection. The Brick & Siding Are just about done. Getting ready for drywall.
248 S Hale - Carpentry
Just before plumbing, electrical, & HVAC.