649 S Oak - Final
We’re all done with this home.
Siding is being installed. And inside drywall is just finishing up.
Inside we installed the cabinets & other carpenter trim. Outside we rough graded and installed the sidewalks.
Rough plumbing is finished and we’re starting the hvac and fireplace install.
Siding is being finished and on the interior the drywall was just hung.
Had a professional take some photos.
The rough framing and roof trusses are finished. Next up is to install the windows.
Here we have the final rough grades, but we still need the top soil, landscaping, and driveway asphalt.
Here we are starting another new home in Arlington Heights. Excavation is done and the foundation was poured. We’re just about to remove the forms and prep for backfill.