2300 Brockway, our concrete contractor is pouring the basement slab now that the temperature has warmed up enough.
156 W Aldridge, rough plumbing & HVAC are complete. The electrician has started on the 2nd floor now.
Home Progress
2300 Brockway, our concrete contractor is pouring the basement slab now that the temperature has warmed up enough.
156 W Aldridge, rough plumbing & HVAC are complete. The electrician has started on the 2nd floor now.
156 W Aldridge is framed with roof shingles & windows installed. The basement slab was just poured and will need a few days to cure before we can continue.
The carpenters are still framing 2300 Brockway. We are hoping the weather holds out for us to get the roof shingles on without any delays.
Both projects are a little further along than the photos, but this was a nice bright to show some progress.
The carpenters have have started framing the house.
The foundations are complete at the 2 homes in Nessies Grove Subdivision. Over at 2300 Brockway we are just forming up the foundation walls.
We started construction at Nessies Grove Subdivision in Palatine. It is a small subdivision where we will build three new homes. We just finished the demo and are starting the foundations on the first two homes. The third home will be built separately probably after these two are complete.
We purchased a large piece of property in Palatine with an old house to be torn down. The property has been subdivided for us to build 3 new homes. Before demolition we let the local fire departments use the old home for practice.
Siding is being installed. And inside drywall is just finishing up.
Inside we installed the cabinets & other carpenter trim. Outside we rough graded and installed the sidewalks.
Rough plumbing is finished and we’re starting the hvac and fireplace install.
Siding is being finished and on the interior the drywall was just hung.