5N773 Rochefort - The Rough

We have all the rough mechanicals installed including framing, fire stop, plumbing, HVAC, and electrical. The masonry and fireplace is just about complete. The well & septic were installed too. We are ready for the Village rough inspections, then moving on to insulation and drywall.

5N773 Rochefort - Concrete

Rough framing & roofing are done. We just poured the concrete slabs. Next we’ll frame the basement and start the mechanicals.

Roof & 2nd Floor Framing

For the most part the weather has been very good for building this winter. Here the carpenters have framed the 2nd floor and are setting roof trusses.

5N773 Rochefort - Kneewall & Steel

Here we have the foundation finshed & backfilled with the kneewall almost complete. Our steel contractor is working with our carpenters to set the steel.

353 N Emroy - Final Interior Photos

Here is the finished home.

353 N Emroy - Flooring & Stairs

Both the oak flooring & oak stairs are installed. Next up is interior trim & millwork. Cabinets have been delayed so we’ll do everything we can until those come in.

353 N Emroy - Exterior Siding

The exterior siding is almost complete. We just need to add the post column wrap on the front stoop. The interior is dry walled, but not much to look at yet. We are starting tile this week.