Here it is. The old house coming down. It's a great rainy day for it too. The rain helps keep the dust down.
Home Progress
239 S Benton - Sewer & Water
Sewer and water main disconnects and stub connections. We disconnect and reconnect at the same time so the street is only opened up once. The stubs in the parkway will be ready to go once the foundation is poured.
239 S Benton - Recycling the Land
This is a great teardown, or as Gary calls it, "recycling the land." We've got the fence up we're ready ready to go for demolition.
Bothwell - Primed and Stairs
Figured it was about time for some updated photos of Bothwell. The weather has been brutal this year; really slowing us up. The masons were able to start last week, but then temperatures dropped again so we have to wait. The new pictures show the stairs by Designed Stairs, and the freshly primed walls.
Bothwell - After Drywall
Bothwell is moving along. Though due the the extreme temperatures we have been having it has been moving slowly. The house is ready for priming, but the garage is still too cold to hang drywall.
Bothwell - Rough
Rough Plumbing, Mechanicals, Electric, and Framing completed. After we pass inspections insulation begins. Then we can finally heat the place up.
111 S Bothwell - Framing
Bothwell is moving along. Roofers start this week.
111 S Bothwell - Trusses
Here's a quick drive by photo of Bothwell with the trusses up.
248 S Hale - Finished
This home is just about finished. Only a few quick miscellaneous items remain. Here's a look at the finished product.
248 S Hale - Painting
Here are a few rooms of Hale freshly painted. The windows have also been cleaned.